Home/Ongoing Projects

Ongoing Projects

Current major works.

Ongoing contracts and project highlights from Ashish Nirman Sewa.

Ongoing

Upgrading of Butwal-Gorusinghe-Chanauta Road and Bridges [CH: 590+000 Km to CH: 615+000 Km, East-West Highway]

Upgrading of a strategic section of the East-West Highway in Rupandehi and Kapilbastu districts, including road widening and bridge construction.

Lot-1: Km 590+000 to Km 615+000
Road upgrading, bridges, and associated structures

Ongoing

Upgrading of Butwal-Gorusinghe-Chanauta Road and Bridges [CH: 615+000 Km to CH: 640+000 Km, East-West Highway]

Upgrading of the second section of the East-West Highway corridor, covering road and bridge works from Km 615+000 to Km 640+000.

Lot-2: Km 615+000 to Km 640+000
Road upgrading, bridges, and associated structures

Ongoing

Construction of Lumbini Provincial Hospital

Construction of a major provincial hospital in the Lumbini Province to enhance regional healthcare infrastructure.

Provincial-level hospital facility
Modern healthcare infrastructure in Lumbini Province

Ongoing

Upgradation, Construction and Performance-based Maintenance of Morka-Changkhila-Badawan-Sanakhola-Juni Road (CH. 0+000 to 17+000) AND Construction of one RCC bridge at Rithekhola with a span of 25 m in Jajarkot district, Karnali Province

Comprehensive road upgradation and bridge construction project in Jajarkot district, Karnali Province, including performance-based maintenance.

Road length: CH. 0+000 to 17+000
One RCC bridge at Rithekhola with 25 m span
Performance-based maintenance included

Ongoing

Upgradation, Construction and Performance-based Maintenance of Dasharathpur-Dandagaun-Jitejuwa-Dharampokhara Road (Dasharathpur-Boragaun section) (CH. 0+000 to 23+000 km) in Surkhet district, Karnali province

Road upgradation and construction project in Surkhet district, Karnali Province, with performance-based maintenance.

Road length: CH. 0+000 to 23+000 km
Dasharathpur-Boragaun section
Performance-based maintenance included

Ongoing

Widening of Suryabinayak Sangha Road Section of Suryabinayak Dhulikhel Road (Ch: 0+000-7+500)

Widening of a key road section connecting Suryabinayak to Dhulikhel, improving traffic flow and connectivity.

Road section: Ch: 0+000 to 7+500
Road widening and improvement works

Ongoing

Rehabilitation of Parallel Taxiway, Apron along with Construction of Road, Bridge and other associated works at Bhairahawa, Rupandehi

Rehabilitation and construction of aviation infrastructure at Bhairahawa, including parallel taxiway, apron, road, and bridge works.

Parallel taxiway rehabilitation
Apron rehabilitation
Road and bridge construction
Associated works at Bhairahawa, Rupandehi

Ongoing

Construction of Double Lane Dual Carriageway Standard Expressway Road, Bridge, Slope Protection/Stabilization Works and Allied Works

Construction of a double-lane dual carriageway expressway with bridges, slope protection, stabilization, and allied works.

Double Lane Dual Carriageway Expressway
Bridge construction
Slope protection and stabilization works

Ongoing

Procurement of Plant Design, Supply, Delivery, Installation, Testing & Commissioning of 400 KV Double Circuit (D/C) Transmission Line (TL) for Lot 1: (A) Base: Lapsiphedi to Ratmate, (B) Option: Ratmate to New Hetauda

Design, supply, installation, testing, and commissioning of a 400 KV double circuit transmission line from Lapsiphedi to Ratmate, with an option to extend to New Hetauda.

Lot 1: Base - Lapsiphedi to Ratmate
Option: Ratmate to New Hetauda
400 KV Double Circuit Transmission Line

Ongoing

Extension of Parallel Taxiway to connect Runway 02 end at TIA and Associated Works

Extension of the parallel taxiway to connect to Runway 02 end at Tribhuvan International Airport (TIA), Kathmandu, along with associated works.

Extension of parallel taxiway to Runway 02 end
Associated works at Tribhuvan International Airport