Home/Portfolio/400 kV Double Circuit Transmission Line [117 KM]

Project Information

Procurement of Plant Design, Supply, Delivery, Installation, Testing and Commissioning of 400 kV Double Circuit Transmission Line [117 KM].

Scope of Works

Ashish Nirman Sewa Pvt. Ltd. is proudly participating in one of Nepal's most significant power transmission infrastructure projects under the Millennium Challenge Account Nepal (MCA-Nepal). The project involves engineering, procurement, supply, delivery, installation, testing, and commissioning of the 400 kV Double Circuit Transmission Line connecting Lapsiphedi and Ratmate, with an option for extension to New Hetauda.

This landmark project is designed to strengthen Nepal's national electricity transmission network by increasing transmission capacity, improving grid reliability and stability, reducing system losses, and supporting the integration of future hydropower generation.

117 KM 400 kV Double Circuit Transmission Line
Lapsiphedi-Ratmate corridor with option for extension to New Hetauda
MCA-Nepal power transmission infrastructure
Detailed engineering and design
Supply and delivery of required materials and equipment
Civil and foundation works
Erection of transmission line towers
Stringing and sagging of conductors and earth wires
Installation of associated fittings and accessories
Testing, inspection, commissioning, and performance verification
Defects rectification during the Defects Notification Period

Delivery Responsibilities

The contractor is responsible for coordination, quality control, site management, and timely completion of the works to achieve successful commissioning and handover of the transmission line in operational condition. All activities are to be carried out in compliance with applicable laws, technical standards, environmental, social, health, and safety requirements, and the instructions of the Employer and Engineer.

ANS is committed to delivering the project in accordance with international standards of engineering excellence, quality assurance, occupational health and safety, environmental and social sustainability, and timely project execution.