Scope of Works
Ashish Nirman Sewa Pvt. Ltd. is proudly participating in one of Nepal's most significant power transmission infrastructure projects under the Millennium Challenge Account Nepal (MCA-Nepal). The project involves engineering, procurement, supply, delivery, installation, testing, and commissioning of the 400 kV Double Circuit Transmission Line connecting Lapsiphedi and Ratmate, with an option for extension to New Hetauda.
This landmark project is designed to strengthen Nepal's national electricity transmission network by increasing transmission capacity, improving grid reliability and stability, reducing system losses, and supporting the integration of future hydropower generation.
Delivery Responsibilities
The contractor is responsible for coordination, quality control, site management, and timely completion of the works to achieve successful commissioning and handover of the transmission line in operational condition. All activities are to be carried out in compliance with applicable laws, technical standards, environmental, social, health, and safety requirements, and the instructions of the Employer and Engineer.
ANS is committed to delivering the project in accordance with international standards of engineering excellence, quality assurance, occupational health and safety, environmental and social sustainability, and timely project execution.