Experiences List

S. No. Project Name Client Completion Year
1 Construction of Secondary canal B3/S5-2& 4, S13, FMIS System... Babai Irrigation Project, Baidi, Bardiya 07/17/2015
2 Radhi Small Hydropower Project. (4.4 MW) Radhi Bidyut company Limited, Kathmandu 03/20/2014
3 Command area Development works at lower reach of Bhalohiya b... Bagmati irrigation Project, Karmaiy... 04/06/2012
4 Pati Khola Hydropower Project. Unified Hydropower Pvt. Ltd Kaski. 08/20/2008
5 Canal re-shaping, Bank Strengthening, Gravelling of Service ... Irrigation Management Directorate, Kamala Hardina Irrigation... 04/28/2017
6 Construction of Spur at Right bank of Koshi river Sunsari Morang Irrigation Project, Biratnagar 01/08/2017
7 Protection Works along NEC Right Bank of Lal Bakeya, Rautaha... Water Induced Disaster Prevention Division office No.3, ... 11/11/2010
8 Construction of Headworks (Weir, Head Regulators and Guide B... Western Irrigation Development Division no. 6, Rupendehi 09/21/2011
9 Construction of Embankment and Protection works along Right... Water Induced Disaster Prevention Division office No.3, ... 05/13/2010
10 Construction of Stud Under Lal Bakeya River training Projec... Water Induced Disaster Prevention Division office No.3, ... 04/08/2011
11 Repair and Maintenance of Spurs and Studs under Bagmati Rive... Water Induced Disaster Prevention Division office No.3, ... 11/10/2011
12 Lower Modi Hydroelectric Project (20 MW) Modi Energy Limited 05/14/2017