Project Description
Ashish Nirman Sewa, as part of M/S Ashish-Contech JV, Bharatpur-10, Chitwan, successfully completed the Construction of Province Hospital Building, Karnali Province at Birendranagar, Surkhet before the deadline.
The project delivered a 300-bed capacity hospital complex with three-storey RCC frame hospital building and basement, maternity block, emergency block, floor extension of the existing block, office block, seminar hall, sanitary, plumbing, firefighting, electrical, telecommunication, and HVAC works.
The works were completed on 4 August 2019, ahead of the intended 25 January 2020 completion date, and received a reward certificate for quality and early completion.
Key Works
Bonus Amount: NRs. 38,372,295.00
Capacity: 300-bed hospital building
Total Floor Area: 16,943.52 Sqm
Operation Theatres: 8 with hermetically sealed door installation
Passenger Lifts: 3 Nos, 15 passenger capacity
Generators: 125 KVA and 40 KVA
Transformer: 250 KVA
Underground Water Tanks: 2 Nos, 80,000 liters each
Steel Overhead Water Tanks: 22 Nos, 2,000 liters each
Blacktop Road: 400 m length, 6 m wide
Earthworks: 50,589.74 Cum
RCC M25: 4,893.71 Cum
RCC M20: 1,796.45 Cum
Form Works: 40,440.29 Sqm
Brick Works: 3,254.38 Cum