Project Description
Ashish Nirman Sewa Pvt. Ltd. is proudly participating in the implementation of one of Nepal's most significant power transmission infrastructure projects under the Millennium Challenge Account Nepal (MCA-Nepal). The project involves the engineering, procurement, supply, delivery, installation, testing, and commissioning of the 400 kV Double Circuit Transmission Line connecting Lapsiphedi and Ratmate, with an option for extension to New Hetauda.
This landmark project is designed to strengthen Nepal's national electricity transmission network by increasing transmission capacity, improving grid reliability and stability, reducing system losses, and supporting the integration of future hydropower generation. It will also facilitate regional power trade and contribute to Nepal's long-term energy security and sustainable economic development.
The scope of works under this contract includes the engineering, procurement, construction, installation, testing, commissioning, and completion of a 117 KM 400 kV Double Circuit Transmission Line in accordance with approved designs, technical specifications, and contractual requirements.
Ashish Nirman Sewa Pvt. Ltd. is committed to delivering the project in accordance with the highest international standards of engineering excellence, quality assurance, occupational health and safety, environmental and social sustainability, and timely project execution.