Project Description
Ashish Nirman Sewa, as part of M/S Rajendra-Kumar-Ashish JV, successfully completed the Design and Build of Chedegad Bridge in Jajarkot along the Chhinchu-Jajarkot Road under the Bridge Branch, Project Coordination Unit of the Department of Roads.
The project delivered a double-lane prestressed concrete motorable bridge with a prestress T-girder superstructure and open foundation, improving reliable road connectivity across the Chedegad crossing in Jajarkot District.
The works were completed on 2075/03/23 against the intended completion date of 2076/03/23, as certified by Bridge Project Western Area, Sector No. 3, Nepalgunj, Banke.
Key Works
Bridge Type: Double-lane prestressed concrete motorable bridge
Carriageway Width: 7.5 m with 1 m footpath on both sides
Bridge Length: 130 m
Span Arrangement: 3 spans of 41 m
Superstructure: Prestress T-girder
Foundation Type: Open foundation
River Training Works: 100 m
Blacktopped Approach Road: 0.15 km (1,125 m²)